Substation Scout

Adams - Magley 138 kV

PJM queue ID C01-1777 Terminal status

Queue IDC01-1777
Project nameAdams - Magley 138 kV
Status (as published)Withdrawn
SubstationAdams - Magley
Point of interconnectionAdams - Magley 138 kV
CountyAdams
StateIN
Voltage138 kV
Capacity140 MW
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2030-09-30
Source datasetcycle

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Terminal status 140 Active → Withdrawn

Full change log →

Additional filed fields

DeveloperENGIE IR Holdings LLC
Transmission OwnerAEP
Project TypeGeneration Interconnection
CycleC01
StagePhase 1
Mw Energy140.0
Mw Capacity140.0
Mfo140.0
Submitted Date4/25/2026
Withdrawn Date9/28/2026
Withdrawn RemarksCIW
Last Updated6/11/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.