Substation Scout

AXTON 765 kV

PJM queue ID C01-1714 Terminal status

Queue IDC01-1714
Project nameAXTON 765 kV
Status (as published)Withdrawn
SubstationAXTON
Point of interconnectionAXTON 765 kV
CountyHenry
StateVA
Voltage765 kV
Capacity520 MW
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2029-04-15
Source datasetcycle

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-28 Terminal status 520 Active → Withdrawn

Full change log →

Additional filed fields

DeveloperSTACK Danville Gen Power 3, LLC
Transmission OwnerAEP
Project TypeGeneration Interconnection
CycleC01
StagePhase 1
Mw Energy520.0
Mw Capacity520.0
Mfo520.0
Submitted Date4/27/2026
Withdrawn Date9/24/2026
Withdrawn RemarksCIW
Last Updated6/23/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.