Wagner 115 kV

PJM queue ID C01-1552 Terminal status

Queue IDC01-1552
Project nameWagner 115 kV
Status (as published)Withdrawn
SubstationWagner
Point of interconnectionWagner 115 kV
CountyAnne Arundel
StateMD
Voltage115 kV
Capacity50 MW
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2029-06-01
Source datasetcycle

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-28 Terminal status 50 Active → Withdrawn

Full change log →

Additional filed fields

DeveloperFORT SMALLWOOD BATTERY STORAGE, LLC
Transmission OwnerBGE
Project TypeGeneration Interconnection
CycleC01
StagePhase 1
Mw Energy50.0
Mw Capacity50.0
Mfo50.0
Submitted Date4/27/2026
Withdrawn Date9/25/2026
Withdrawn RemarksCIW
Last Updated6/9/2026