Silver Lake 138
PJM queue ID AI2-229 Terminal status
| Queue ID | AI2-229 |
|---|---|
| Project name | Silver Lake 138 |
| Status (as published) | Withdrawn |
| Substation | Silver Lake 138 |
| Point of interconnection | Silver Lake 138 |
| County | McHenry |
| State | IL |
| Voltage | Not reported |
| Capacity | 120 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalised for filtering) |
| Target commercial operation | 2024-11-06 |
| Source dataset | serial |
Additional filed fields
| Project Type | Generation Interconnection |
|---|---|
| Mw Energy | 0 |
| Mw Capacity | 120 |
| Mfo | 200 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.