PA Centre Borealis 34.5 kV
PJM queue ID AI2-017 Terminal status
| Queue ID | AI2-017 |
|---|---|
| Project name | PA Centre Borealis 34.5 kV |
| Status (as published) | Withdrawn |
| Substation | PA Centre Borealis |
| Point of interconnection | PA Centre Borealis 34.5 kV |
| County | Centre |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 3 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2026-12-01 |
| Source dataset | serial |
Additional filed fields
| Project Type | Generation Interconnection |
|---|---|
| Mw Energy | 5 |
| Mw Capacity | 3 |
| Mfo | 5 |
| Withdrawn Date | 4/3/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.