Substation Scout

Possum Point 230 kV

PJM queue ID AH2-060 Terminal status

Queue IDAH2-060
Project namePossum Point 230 kV
Status (as published)Withdrawn
SubstationPossum Point
Point of interconnectionPossum Point 230 kV
CountyPrince William
StateVA
Voltage230 kV
Capacity55 MW
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2027-12-01
Source datasetserial

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy55
Mw Capacity55
Mfo55

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.