Substation Scout

Timber Switch 138 kV

PJM queue ID AH1-522 Terminal status

Queue IDAH1-522
Project nameTimber Switch 138 kV
Status (as published)Withdrawn
SubstationTimber Switch
Point of interconnectionTimber Switch 138 kV
CountyPaulding
StateOH
Voltage138 kV
Capacity28.2 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2024-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy47
Mw Capacity28.2
Mfo47
Withdrawn Date12/18/2024

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.