Substation Scout

Maysville Solar 2

PJM queue ID AH1-487 Terminal status

Queue IDAH1-487
Project nameMaysville Solar 2
Status (as published)Withdrawn
SubstationCamp Reynolds
Point of interconnectionCamp Reynolds 12.5 kV
CountyMercer
StatePA
Voltage12.5 kV
Capacity12 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2028-10-01
Source datasetcycle

Additional filed fields

DeveloperPD Solar 11 LLC
Transmission OwnerATSI
Project TypeGeneration Interconnection
CycleTC2
StageDecision Point 1
Mw Energy20.0
Mw Capacity12.0
Mfo20.0
Submitted Date9/10/2021
Withdrawn Date12/2/2025
Withdrawn RemarksCIW

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.