Substation Scout

Leasure 12.47kV

PJM queue ID AH1-276 Terminal status

Queue IDAH1-276
Project nameLeasure 12.47kV
Status (as published)Withdrawn
SubstationLeasure
Point of interconnectionLeasure 12.47kV
CountyCampbell
StateVA
Voltage12.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2023-11-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy4.99
Mw Capacity0
Mfo4.99
Withdrawn Date6/15/2022

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.