Substation Scout

Smithfield-Surry 230 kV

PJM queue ID AH1-216 Terminal status

Queue IDAH1-216
Project nameSmithfield-Surry 230 kV
Status (as published)Withdrawn
SubstationSmithfield-Surry
Point of interconnectionSmithfield-Surry 230 kV
CountyIsle of Wight
StateVA
Voltage230 kV
Capacity79.2 MW
Resource (as published)Solar,Storage,Hybrid
Resource categoryHybrid (normalised for filtering)
Target commercial operation2028-11-30
Source datasetcycle

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Terminal status 79.2 Active → Withdrawn

Full change log →

Additional filed fields

DeveloperBoykin Solar Center, LLC
Transmission OwnerDominion
Project TypeGeneration Interconnection
CycleTC2
StageDecision Point 2
Mw Energy99.0
Mw Capacity79.2
Mfo99.0
Submitted Date9/8/2021
Withdrawn Date9/30/2026
Withdrawn RemarksCIW
Last Updated12/22/2025

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.