Powerton 138 kV

PJM queue ID AH1-191 Terminal status

Queue IDAH1-191
Project namePowerton 138 kV
Status (as published)Withdrawn
SubstationPowerton
Point of interconnectionPowerton 138 kV
CountyTazewell
StateIL
Voltage138 kV
Capacity12.1 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalised for filtering)
Target commercial operation2025-06-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy20.9
Mw Capacity12.065
Mfo20.9
Withdrawn Date12/18/2024

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.