Substation Scout

Cooper 34.5kV

PJM queue ID AH1-139 Terminal status

Queue IDAH1-139
Project nameCooper 34.5kV
Status (as published)Withdrawn
SubstationCooper
Point of interconnectionCooper 34.5kV
CountyYork
StatePA
Voltage34.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2022-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy3
Mw Capacity0
Mfo3
Withdrawn Date12/18/2024

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.