River EC 138 kV

PJM queue ID AH1-101 Terminal status

Queue IDAH1-101
Project nameRiver EC 138 kV
Status (as published)Withdrawn
SubstationRiver EC
Point of interconnectionRiver EC 138 kV
CountyCook
StateIL
Voltage138 kV
Capacity23.1 MW
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2024-05-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy57.78
Mw Capacity23.12
Mfo57.78
Withdrawn Date8/26/2021

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.