Crossroads Solar I

PJM queue ID AH1-060 Terminal status

Queue IDAH1-060
Project nameCrossroads Solar I
Status (as published)Withdrawn
SubstationCardington-Liberty III
Point of interconnectionCardington-Liberty 69 kV III
CountyMorrow
StateOH
Voltage69 kV
Capacity12 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2029-01-31
Source datasetcycle

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Terminal status 12 Active → Withdrawn

Full change log →

Additional filed fields

DeveloperCrossroads Solar I, LLC
Transmission OwnerATSI
Project TypeGeneration Interconnection
CycleTC2
StageDecision Point 2
Mw Energy20.0
Mw Capacity12.0
Mfo94.0
Submitted Date7/20/2021
Withdrawn Date9/30/2026
Withdrawn RemarksCMN
Last Updated12/23/2025