Kensignton 138kV
PJM queue ID AG2-585 Terminal status
| Queue ID | AG2-585 |
|---|---|
| Project name | Kensignton 138kV |
| Status (as published) | Withdrawn |
| Substation | Kensignton |
| Point of interconnection | Kensignton 138kV |
| County | Kankakee |
| State | IL |
| Voltage | 138 kV |
| Capacity | 33 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | cycle |
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Terminal status | 33 | Active → Withdrawn |
Additional filed fields
| Developer | Grand Marsh Solar 2, LLC |
|---|---|
| Transmission Owner | ComEd |
| Project Type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Decision Point 2 |
| Mw Energy | 55.0 |
| Mw Capacity | 33.0 |
| Mfo | 55.0 |
| Submitted Date | 3/31/2021 |
| Withdrawn Date | 9/30/2026 |
| Withdrawn Remarks | CIW |
| Last Updated | 5/6/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.