Elderberry 345 kV

PJM queue ID AG2-562 Terminal status

Queue IDAG2-562
Project nameElderberry 345 kV
Status (as published)Withdrawn
SubstationElderberry
Point of interconnectionElderberry 345 kV
CountySt. Joseph
StateIN
Voltage345 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2025-12-31
Source datasetcycle

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Terminal status 0 Active → Withdrawn

Full change log →

Additional filed fields

DeveloperSt. Joseph Energy Center, LLC
Transmission OwnerAEP
Project TypeGeneration Interconnection
CycleTC2
StageDecision Point 2
Mw Energy52.0
Mw Capacity0.0
Mfo767.0
Submitted Date3/31/2021
Withdrawn Date9/30/2026
Withdrawn RemarksCIW
Last Updated12/19/2025

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.