Substation Scout

Wakefield - Waverly 115 kV

PJM queue ID AG2-426 Terminal status

Queue IDAG2-426
Project nameWakefield - Waverly 115 kV
Status (as published)Withdrawn
SubstationWakefield - Waverly
Point of interconnectionWakefield - Waverly 115 kV
CountySussex
StateVA
Voltage115 kV
Capacity33.5 MW
Resource (as published)Solar,Storage,Hybrid
Resource categoryHybrid (normalised for filtering)
Target commercial operation2028-04-30
Source datasetcycle

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Terminal status 33.5 Active → Withdrawn

Full change log →

Additional filed fields

DeveloperWaverly Solar 1, LLC
Transmission OwnerDominion
Project TypeGeneration Interconnection
CycleTC2
StageDecision Point 2
Mw Energy33.5
Mw Capacity33.5
Mfo33.5
Submitted Date3/30/2021
Withdrawn Date9/30/2026
Withdrawn RemarksCIW
Last Updated12/24/2025

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.