Substation Scout

Burlington Energy Storage

PJM queue ID AG2-422 Terminal status

Queue IDAG2-422
Project nameBurlington Energy Storage
Status (as published)Withdrawn
SubstationBustleton
Point of interconnectionBustleton 13 kV
CountyAtlantic
StateNJ
Voltage13 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar; Storage
Resource categoryHybrid (normalised for filtering)
Target commercial operation2023-12-12
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy1.2
Mw Capacity0
Mfo1.2
Withdrawn Date2/22/2022

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.