Substation Scout

LH Church

PJM queue ID AG2-389 Terminal status

Queue IDAG2-389
Project nameLH Church
Status (as published)Withdrawn
SubstationTrexlertown
Point of interconnectionTrexlertown 12 kV
CountyCity of Lynchburg
StateVA
Voltage12 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar; Storage
Resource categoryHybrid (normalised for filtering)
Target commercial operation2024-04-18
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy3
Mw Capacity0
Mfo3
Withdrawn Date11/22/2023

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.