South Troy - Canton 34.5 kV
PJM queue ID AG2-356 Terminal status
| Queue ID | AG2-356 |
|---|---|
| Project name | South Troy - Canton 34.5 kV |
| Status (as published) | Withdrawn |
| Substation | South Troy - Canton |
| Point of interconnection | South Troy - Canton 34.5 kV |
| County | Bradford |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 12 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2027-12-01 |
| Source dataset | cycle |
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Terminal status | 12 | Active → Withdrawn |
Additional filed fields
| Developer | Robin Solar LLC |
|---|---|
| Transmission Owner | PENELEC |
| Project Type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Decision Point 2 |
| Mw Energy | 20.0 |
| Mw Capacity | 12.0 |
| Mfo | 20.0 |
| Submitted Date | 3/26/2021 |
| Withdrawn Date | 9/30/2026 |
| Withdrawn Remarks | CIW |
| Last Updated | 12/19/2025 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.