Dequine 345 bkV
PJM queue ID AG2-344 Terminal status
| Queue ID | AG2-344 |
|---|---|
| Project name | Dequine 345 bkV |
| Status (as published) | Withdrawn |
| Substation | Dequine |
| Point of interconnection | Dequine 345 bkV |
| County | Not Specified |
| State | IN |
| Voltage | 345 kV |
| Capacity | 78 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalised for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | cycle |
Additional filed fields
| Developer | Rainbow Trout Solar LLC |
|---|---|
| Transmission Owner | AEP |
| Project Type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Decision Point 1 |
| Mw Energy | 100.0 |
| Mw Capacity | 78.0 |
| Mfo | 100.0 |
| Submitted Date | 3/26/2021 |
| Withdrawn Date | 12/2/2025 |
| Withdrawn Remarks | CIW |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.