Substation Scout

Old Church 34.5 kV

PJM queue ID AG2-240 Terminal status

Queue IDAG2-240
Project nameOld Church 34.5 kV
Status (as published)Withdrawn
SubstationOld Church
Point of interconnectionOld Church 34.5 kV
CountyHanover
StateVA
Voltage34.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2027-12-31
Source datasetcycle

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Terminal status 0 Active → Withdrawn

Full change log →

Additional filed fields

DeveloperMechanicsville Solar, LLC
Transmission OwnerDominion
Project TypeGeneration Interconnection
CycleTC2
StageDecision Point 2
Mw Energy0.0
Mw Capacity0.0
Mfo25.0
Submitted Date3/16/2021
Withdrawn Date9/30/2026
Withdrawn RemarksCMN
Last Updated3/24/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.