Geneva 115 kV

PJM queue ID AG2-176 Terminal status

Queue IDAG2-176
Project nameGeneva 115 kV
Status (as published)Withdrawn
SubstationGeneva
Point of interconnectionGeneva 115 kV
CountyCrawford
StatePA
Voltage115 kV
Capacity90 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2029-12-30
Source datasetcycle

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Terminal status 90 Active → Withdrawn

Full change log →

Additional filed fields

DeveloperTrestle Solar Farm, LLC
Transmission OwnerPENELEC
Project TypeGeneration Interconnection
CycleTC2
StageDecision Point 2
Mw Energy150.0
Mw Capacity90.0
Mfo150.0
Submitted Date2/26/2021
Withdrawn Date9/30/2026
Withdrawn RemarksCIW
Last Updated12/22/2025

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.