Substation Scout

Clinch River-Copper Ridge 138 kV

PJM queue ID AG2-168 Terminal status

Queue IDAG2-168
Project nameClinch River-Copper Ridge 138 kV
Status (as published)Withdrawn
SubstationClinch River-Copper Ridge
Point of interconnectionClinch River-Copper Ridge 138 kV
CountyRussell
StateVA
Voltage138 kV
Capacity63.3 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2022-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy95
Mw Capacity63.3333
Mfo95
Withdrawn Date12/18/2024

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.