River Dock 23 kV
PJM queue ID AG2-150 Terminal status
| Queue ID | AG2-150 |
|---|---|
| Project name | River Dock 23 kV |
| Status (as published) | Withdrawn |
| Substation | River Dock |
| Point of interconnection | River Dock 23 kV |
| County | Allegheny |
| State | PA |
| Voltage | 23 kV |
| Capacity | 5.3 MW |
| Resource (as published) | Hydro |
| Resource category | Hydro (normalised for filtering) |
| Target commercial operation | 2022-12-31 |
| Source dataset | cycle |
Additional filed fields
| Developer | Lock+ Hydro Friends Fund XLII, LLC |
|---|---|
| Transmission Owner | DL |
| Project Type | Generation Interconnection |
| Cycle | TC2 |
| Stage | APPLICATION PHASE |
| Mw Energy | 5.25 |
| Mw Capacity | 5.25 |
| Mfo | 5.25 |
| Submitted Date | 2/23/2021 |
| Withdrawn Date | 4/7/2025 |
| Withdrawn Remarks | Customer Milestone Not Met |
| Last Updated | 4/7/2025 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.