Forest G. Hipple-Dunton Lake 345 kV
PJM queue ID AG2-029 Terminal status
| Queue ID | AG2-029 |
|---|---|
| Project name | Forest G. Hipple-Dunton Lake 345 kV |
| Status (as published) | Withdrawn |
| Substation | Forest G. Hipple-Dunton Lake |
| Point of interconnection | Forest G. Hipple-Dunton Lake 345 kV |
| County | Noble |
| State | IN |
| Voltage | 345 kV |
| Capacity | 32.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | cycle |
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Terminal status | 32.5 | Active → Withdrawn |
Additional filed fields
| Developer | Southern Pike Solar LLC |
|---|---|
| Transmission Owner | AEP |
| Project Type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Decision Point 2 |
| Mw Energy | 250.0 |
| Mw Capacity | 32.5 |
| Mfo | 250.0 |
| Submitted Date | 10/23/2020 |
| Withdrawn Date | 9/30/2026 |
| Withdrawn Remarks | CIW |
| Last Updated | 2/24/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.