Erie South-Warren 230 kV II
PJM queue ID AG2-009 Terminal status
| Queue ID | AG2-009 |
|---|---|
| Project name | Erie South-Warren 230 kV II |
| Status (as published) | Withdrawn |
| Substation | Erie South-Warren II |
| Point of interconnection | Erie South-Warren 230 kV II |
| County | Erie |
| State | PA |
| Voltage | 230 kV |
| Capacity | 12.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2023-03-30 |
| Source dataset | cycle |
Additional filed fields
| Developer | Blatche Solar, LLC |
|---|---|
| Transmission Owner | PENELEC |
| Project Type | Generation Interconnection |
| Cycle | TC2 |
| Stage | PHASE 1 |
| Mw Energy | 20.0 |
| Mw Capacity | 12.9 |
| Mfo | 80.0 |
| Submitted Date | 10/8/2020 |
| Withdrawn Date | 6/19/2025 |
| Withdrawn Remarks | Customer Initiated Withdrawal |
| Last Updated | 10/31/2025 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.