Horsepen Branch Solar

PJM queue ID AG1-558 Terminal status

Queue IDAG1-558
Project nameHorsepen Branch Solar
Status (as published)Withdrawn
SubstationBuckner
Point of interconnectionBuckner 34.5 kV
CountyLouisa
StateVA
Voltage34.5 kV
Capacity13.3 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalised for filtering)
Target commercial operation2027-10-29
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy20
Mw Capacity13.3
Mfo20
Withdrawn Date3/25/2026