Substation Scout

Beech Hollow Solar

PJM queue ID AG1-527 Terminal status

Queue IDAG1-527
Project nameBeech Hollow Solar
Status (as published)Withdrawn
SubstationImperial-Joffre
Point of interconnectionImperial-Joffre 138 kV
CountyAllegheny
StatePA
Voltage138 kV
Capacity129 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2028-07-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy215
Mw Capacity129
Mfo215
Withdrawn Date1/6/2025

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.