Tillman Solar Park

PJM queue ID AG1-368 Terminal status

Queue IDAG1-368
Project nameTillman Solar Park
Status (as published)Withdrawn
SubstationTillman
Point of interconnectionTillman 138 kV
CountyAllen
StateIN
Voltage138 kV
Capacity60 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2029-12-31
Source datasetserial

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Terminal status 60 Engineering and Procurement → Withdrawn

Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy100
Mw Capacity60
Mfo100
Withdrawn Date12/8/2025

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.