Substation Scout

ASD Brick Plant PA2 Solar

PJM queue ID AG1-330 Terminal status

Queue IDAG1-330
Project nameASD Brick Plant PA2 Solar
Status (as published)Withdrawn
SubstationBeavertown
Point of interconnectionBeavertown 12.47 kV
CountyBeaver
StatePA
Voltage12.5 kV
Capacity4.5 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalised for filtering)
Target commercial operation2024-03-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy5
Mw Capacity4.5
Mfo5
Withdrawn Date3/23/2022

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.