U.S. Silica 12.47 kV

PJM queue ID AG1-299 Terminal status

Queue IDAG1-299
Project nameU.S. Silica 12.47 kV
Status (as published)Withdrawn
SubstationU.S. Silica
Point of interconnectionU.S. Silica 12.47 kV
CountyAtlantic
StateNJ
Voltage12.5 kV
Capacity1.8 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2021-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy3
Mw Capacity1.8
Mfo3
Withdrawn Date10/1/2021

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.