Substation Scout

Boyles Run Solar

PJM queue ID AG1-259 Terminal status

Queue IDAG1-259
Project nameBoyles Run Solar
Status (as published)Withdrawn
SubstationSunbury-Dalmatia
Point of interconnectionSunbury-Dalmatia 69 kV
CountyNorthumberland
StatePA
Voltage69 kV
Capacity6.7 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2028-04-30
Source datasetserial

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-12 Status change n/a Pending Termination → Withdrawn

Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy15.9
Mw Capacity6.7
Mfo15.9
Withdrawn Date9/11/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.