Southern Ocean Waretown Solar
PJM queue ID AG1-189 Terminal status
| Queue ID | AG1-189 |
|---|---|
| Project name | Southern Ocean Waretown Solar |
| Status (as published) | Pending Termination |
| Substation | Oyster Creek-Bamber Lake 34.5 |
| Point of interconnection | Oyster Creek-Bamber Lake 34.5 |
| County | Ocean |
| State | NJ |
| Voltage | Not reported |
| Capacity | 5.1 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | serial |
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-08-31 | Terminal status | 5.1 | Engineering and Procurement → Pending Termination |
Additional filed fields
| Project Type | Generation Interconnection |
|---|---|
| Mw Energy | 12 |
| Mw Capacity | 5.1 |
| Mfo | 12 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.