NW-Rocky Ford Solar
PJM queue ID AG1-168 Terminal status
| Queue ID | AG1-168 |
|---|---|
| Project name | NW-Rocky Ford Solar |
| Status (as published) | Withdrawn |
| Substation | Lone Pine |
| Point of interconnection | Lone Pine 115 kV |
| County | Nottoway |
| State | VA |
| Voltage | 115 kV |
| Capacity | 4.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2021-10-15 |
| Source dataset | cycle |
Additional filed fields
| Developer | NW-Rocky Ford LLC |
|---|---|
| Transmission Owner | Dominion |
| Project Type | Generation Interconnection |
| Cycle | TC1 |
| Stage | PHASE 3 |
| Mw Energy | 15.0 |
| Mw Capacity | 4.5 |
| Mfo | 50.0 |
| Submitted Date | 9/16/2020 |
| Withdrawn Date | 11/3/2025 |
| Withdrawn Remarks | Customer Initiated Withdrawal |
| Last Updated | 11/4/2025 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.