Allegheny Tunnel 23 kV

PJM queue ID AG1-077 Terminal status

Queue IDAG1-077
Project nameAllegheny Tunnel 23 kV
Status (as published)Withdrawn
SubstationAllegheny Tunnel
Point of interconnectionAllegheny Tunnel 23 kV
CountyMagoffin
StateKY
Voltage23 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage; Solar
Resource categoryHybrid (normalised for filtering)
Target commercial operation2022-05-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy3.7
Mw Capacity0
Mfo3.7
Withdrawn Date9/21/2021

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.