Bermuda Energy

PJM queue ID AG1-064 Terminal status

Queue IDAG1-064
Project nameBermuda Energy
Status (as published)Withdrawn
SubstationPlaza
Point of interconnectionPlaza 34.5 kV
CountyCity of Richmond
StateVA
Voltage34.5 kV
Capacity8 MW
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2023-12-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy19.1
Mw Capacity8
Mfo19.1
Withdrawn Date6/24/2022

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.