Substation Scout

Salt Solar

PJM queue ID AG1-041 Terminal status

Queue IDAG1-041
Project nameSalt Solar
Status (as published)Withdrawn
SubstationOsterburg-Bedford North
Point of interconnectionOsterburg-Bedford North 23 kV
CountyBedford
StatePA
Voltage23 kV
Capacity7.2 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2026-07-25
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy12
Mw Capacity7.2
Mfo12
Withdrawn Date7/22/2025

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.