Foxglove Solar Storage Uprate
PJM queue ID AG1-012 Terminal status
| Queue ID | AG1-012 |
|---|---|
| Project name | Foxglove Solar Storage Uprate |
| Status (as published) | Withdrawn |
| Substation | Meadow Brook-Strasburg II |
| Point of interconnection | Meadow Brook-Strasburg 138 kV II |
| County | Frederick |
| State | VA |
| Voltage | 138 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalised for filtering) |
| Target commercial operation | 2022-06-30 |
| Source dataset | serial |
Additional filed fields
| Project Type | Generation Interconnection |
|---|---|
| Mw Energy | 0 |
| Mw Capacity | 0 |
| Mfo | 75 |
| Withdrawn Date | 9/12/2023 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.