Substation Scout

Grange Solar

PJM queue ID AG1-004 Terminal status

Queue IDAG1-004
Project nameGrange Solar
Status (as published)Withdrawn
SubstationMarysville-Sorenson
Point of interconnectionMarysville-Sorenson 765 kV
CountyLogan
StateOH
Voltage765 kV
Capacity200 MW
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2023-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy200
Mw Capacity200
Mfo1100
Withdrawn Date2/12/2025

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.