BR-Kutztown

PJM queue ID AF2-431 Terminal status

Queue IDAF2-431
Project nameBR-Kutztown
Status (as published)Withdrawn
SubstationBaldy
Point of interconnectionBaldy 13.2 kV
CountyBerks
StatePA
Voltage13.2 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar; Storage
Resource categoryHybrid (normalised for filtering)
Target commercial operation2022-09-30
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy1.17
Mw Capacity0
Mfo1.166
Withdrawn Date1/2/2024

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.