Substation Scout

FA-Morgantown

PJM queue ID AF2-292 Terminal status

Queue IDAF2-292
Project nameFA-Morgantown
Status (as published)Withdrawn
SubstationSouth Union
Point of interconnectionSouth Union 12.47 kV
CountyFayette
StatePA
Voltage12.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar; Storage
Resource categoryHybrid (normalised for filtering)
Target commercial operation2026-04-09
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy1.17
Mw Capacity0
Mfo1.17
Withdrawn Date1/2/2024

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.