Substation Scout

NO-Oakes

PJM queue ID AF2-284 Terminal status

Queue IDAF2-284
Project nameNO-Oakes
Status (as published)Withdrawn
SubstationWatson
Point of interconnectionWatson 12.47 kV
CountyNorthumberland
StatePA
Voltage12.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar; Storage
Resource categoryHybrid (normalised for filtering)
Target commercial operation2023-02-02
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy2
Mw Capacity0
Mfo2
Withdrawn Date11/22/2023

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.