Substation Scout

LK-Justus

PJM queue ID AF2-282 Terminal status

Queue IDAF2-282
Project nameLK-Justus
Status (as published)Withdrawn
SubstationEdelle
Point of interconnectionEdelle 12.47 kV
CountyLackawanna
StatePA
Voltage12.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar; Storage
Resource categoryHybrid (normalised for filtering)
Target commercial operation2023-02-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy3
Mw Capacity0
Mfo3
Withdrawn Date6/28/2022

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.