Substation Scout

BL-Kettle

PJM queue ID AF2-271 Terminal status

Queue IDAF2-271
Project nameBL-Kettle
Status (as published)Withdrawn
SubstationPemberton-Sinking Valley
Point of interconnectionPemberton-Sinking Valley 12.47 kV
CountyBlair
StatePA
Voltage12.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar; Storage
Resource categoryHybrid (normalised for filtering)
Target commercial operation2022-09-30
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy3
Mw Capacity0
Mfo3
Withdrawn Date3/11/2024

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.