Substation Scout

BE-Chalybeate

PJM queue ID AF2-270 Terminal status

Queue IDAF2-270
Project nameBE-Chalybeate
Status (as published)Withdrawn
SubstationBedford South RCB-Bedford Area
Point of interconnectionBedford South RCB-Bedford Area 23 kV
CountyBedford
StatePA
Voltage23 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar; Storage
Resource categoryHybrid (normalised for filtering)
Target commercial operation2022-09-30
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy3.72
Mw Capacity0
Mfo3.721
Withdrawn Date10/6/2023

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.