Substation Scout

Great Cove Solar

PJM queue ID AF2-116 Terminal status

Queue IDAF2-116
Project nameGreat Cove Solar
Status (as published)Withdrawn
SubstationMcConnellsburg
Point of interconnectionMcConnellsburg 138 kV
CountyFulton
StatePA
Voltage138 kV
Capacity13.3 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2027-09-30
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy20
Mw Capacity13.3
Mfo90
Withdrawn Date11/20/2024

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.