Substation Scout

Fairton 12 kV

PJM queue ID AF2-058 Terminal status

Queue IDAF2-058
Project nameFairton 12 kV
Status (as published)Withdrawn
SubstationFairton
Point of interconnectionFairton 12 kV
CountyCumberland
StateNJ
Voltage12 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2021-03-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy2.5
Mw Capacity0
Mfo5
Withdrawn Date9/1/2020

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.