Substation Scout

G Morris Solar

PJM queue ID AF1-271A Terminal status

Queue IDAF1-271A
Project nameG Morris Solar
Status (as published)Withdrawn
SubstationGratz
Point of interconnectionGratz 69 kV
CountyDauphin
StatePA
Voltage69 kV
Capacity10.2 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2026-04-15
Source datasetserial

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-14 Status change n/a Pending Termination → Withdrawn

Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy17
Mw Capacity10.2
Mfo17
Withdrawn Date9/8/2026