Birch Solar

PJM queue ID AF1-164 Terminal status

Queue IDAF1-164
Project nameBirch Solar
Status (as published)Withdrawn
SubstationSouthwest Lima
Point of interconnectionSouthwest Lima 345 kV
CountyAllen
StateOH
Voltage345 kV
Capacity195 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2027-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy300
Mw Capacity195
Mfo300
Withdrawn Date1/9/2025

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.